Simmons Bank Liberty Bowl Traffic Coating Project
Industry
Restoration
Services
Concrete Restoration
Expansion control
Joint Sealants
Pedestrian Traffic Coating
Apex contracted the removal of existing expansion joints and new installation of compression seal expansion control joints with aluminum plate covers. The scope included power washing of existing concrete steps and risers, walkways, plaza deck areas, and ramps and installing a new high performance traffic coating system. Finally, patching of all concrete where water intrusion had deteriorated the concrete walls of the stadium.